Lead Time & Delivery Date Estimator

When will your order ship? Use this free estimator (beta) to see Benchmark’s typical lead time for cut bearing pads, STB-1 Structural Thermal Break, PTFE slide bearings, shimmed bearings and A193 B8 Class 2 bolts, and an estimated ship and delivery date from your order date. We manufacture in Canada, so most orders ship in days, not weeks.

Order

Lead time starts when drawings and the purchase order are approved. Enter your carrier’s transit time to estimate delivery.

Estimate

Estimates only. Lead times for pads, STB-1 and bearings are in working days (Monday to Friday); B8 / B8M Class 2 bolts are in calendar days. Statutory holidays are not taken into account. Typical lead times are for standard orders; large quantities and custom designs can take longer. Expedited service is available: call 800-580-4195.

Why Benchmark Lead Times Are Short

  • We are the manufacturer. Pads, thermal breaks and bearings are cut, bonded and assembled in-house in Canada.
  • Stock on hand. Standard pad materials are stocked for cutting to size, typically in 2–3 days.
  • Standard designs. Standard slide bearing designs ship in 10–12 days.
  • Expedited service is available when a schedule is tight.

Related design tools: Design tools  ·  Specification Writer  ·  PTFE Slide Bearing Calculator  ·  All engineering design tools

Products: Bearing pads in stock  ·  STB-1  ·  B8 Class 2 lead times

Request a Quote or Data Sheet

Send us your drawings and required date and we will confirm lead time and quote. Call 800-580-4195 or use the form below.